F510 & F525 Starter – SOLENOID TEST

NOTE: If bench test indicated solenoid problems, use an ohmmeter or test light to check solenoid.
1. Test solenoid terminals (A and B) for continuity. There should be NO CONTINUITY.
2. Depress switch arm (C). There SHOULD BE CONTINUITY when arm is fully depressed.
3. Test for open circuits between terminal (B) and tang (D). There SHOULD BE CONTINUITY.
4. Test for open circuits between tang (D) and body (E). There SHOULD BE CONTINUITY.
5. If solenoid fails any test, it is defective and MUST BE REPLACED.

07. June 2021 by samuel07042012
Categories: F510-F525 | Leave a comment

Leave a Reply

Required fields are marked *