F510 & F525 Transmission – ASSEMBLE ROTATING GROUP

1. Install spacer (F), if equipped, and gear (E).
2. Install case (C) and O-rings.
3. Install (26) rollers (D).
4. Install spacer (B).
5. Install shaft (A).
A—Output Shaft
B—Spacer
C—Case
D—Rollers
E—Cycloid Gear
F—Spacer

6. Install transmission assembly (C). Tighten axle housing cap screws, in sequence show, to initial torque of 30 N·m (22 lb-ft). Then in 5 N·m (44 lb-in.) increments to final torque of 42 N·m (31 lb-ft).
7. Check torque of cap screws (B). Torque should be 25.5 N·m (225 lb-in.).
8. Install oil lines (A). Tighten nuts to 79 N·m (58 lb-ft).

29. June 2021 by samuel07042012
Categories: F510-F525 | Leave a comment

Leave a Reply

Required fields are marked *